UPDATE REGARDING OLD STOCKBRIDGE CULVERT REPAIR: The east culvert has been assembled and the concrete liner has been completed. The contractor has backfilled around both pipes and is starting to backfill for the roadway. The 36-inch water line has had its coating repaired and re-wrapped and all of the temporary supports have been removed.
Starting, Tuesday, December 4 conduits for the utility relocation’s will be installed, a 12-inch water line will be re-installed and backfill for the roadway will be completed. Remaining items of work are pouring curb, gutter and sidewalks, paving the roadway and installing guardrail.
Please keep in mind, all work is dependent on the weather. Estimated time of project completion is late December 2018.
For questions, concerns and/or to speak with someone about this project, please feel free to contact Public Works Customer Service at 410-313-3440 or email publicworks@howardcountymd.gov.
Source: https://www.facebook.com/hocogov/posts/1935701506477084